Installation of photovoltaic panels Câmpulung

ADREM has carried out for SC Nimbus Com SRL the design, installation and commissioning of a photovoltaic system designed to reduce the electricity consumption of a store located in the center of Câmpulung.

Following the analysis of energy consumption and the evaluation of the existing conditions on site, a three-phase photovoltaic installation consisting of 16 photovoltaic panels, with an installed power of 6 kW, and a Huawei inverter of 10 kW was dimensioned. The system was mounted on the terrace of the building, using an aluminum structure intended for non-circulating terraces, a solution chosen to ensure both the stability of the installation and the optimal use of the available surface.

The execution of the works was carried out by a team consisting of a coordinating engineer and two specialized electricians. The coordinating engineer ensured the design and implementation of the electrical part, as well as the commissioning of the installation, while the execution team carried out the complete assembly of the system. The entire project was completed in just two days, in compliance with all occupational health and safety norms and the use of specific equipment for working at height and electrical installations.

Completed on September 29, 2022, the installation contributes to reducing the store’s electricity consumption by up to 50%, generating energy from renewable sources and reducing dependence on energy supplied from the public grid.

Through this project, the client benefits from reduced operational costs and greater energy independence, while the local community gains by increasing the share of green energy and reducing the environmental impact. The project reflects ADREM’s commitment to developing sustainable and efficient solutions in the field of renewable energy.

16

photovoltaic panels

10 kW

Huawei inverter

6 kW

Installed power

-50%

Reducing consumption

alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 100 kW pentru Halele Centrale Obor"
100 kW photovoltaic system for Obor Central Halls
The integration of a renewable energy production solution in a building with representative historical and commercial value for Bucharest was the main objective of this project. The photovoltaic system installed at the Obor Central Halls contributes to reducing the energy consumption of the public grid and increasing the energy efficiency of one of the most well-known markets in Romania.