Projects

Modernization of the public lighting system in Plenița commune, Dolj county
ADREM carried out the modernization works of the public lighting system in Plenița commune, Dolj County, a project aimed at increasing energy efficiency, reducing operating costs and improving the quality of lighting for the community’s inhabitants.
1.6 MW photovoltaic system for Ford Otosan Romania
As part of Ford Otosan Romania’s energy efficiency and sustainability strategy, a high-capacity photovoltaic system was implemented, intended to produce renewable energy for own consumption and optimize the energy consumption of the industrial facility.
alt="Sistem fotovoltaic de 110 kW pentru Auto Cobălcescu"
110 kW photovoltaic system for Auto Cobălcescu
The investment made for Auto Cobălcescu represents an important step towards reducing energy consumption and adopting sustainable solutions for carrying out operational activities. The implemented photovoltaic system was designed to capitalize on solar energy and reduce dependence on energy supplied from the public grid.
alt="Sistem fotovoltaic de 173,8 kWp pentru MRK Sport Business"
173.8 kWp photovoltaic system for MRK Sport Business
For MRK Sport Business, an On-Grid photovoltaic system was implemented to increase energy efficiency and reduce costs associated with electricity consumption. The project is part of the company’s strategy to adopt sustainable solutions and capitalize on renewable energy sources.
alt="Centrală fotovoltaică de 2,7 MW pentru Nurvil"
2.7 MW photovoltaic power plant for Nurvil
The development of energy production from renewable sources was the basis of the project carried out for Nurvil, consisting of the design and execution of a utility-scale photovoltaic plant with an installed capacity of 2.7 MW in Vâlcea County. The project represents an important investment in green energy infrastructure and demonstrates ADREM’s ability to deliver complex solutions for large-scale energy production.
alt="Stații de încărcare pentru vehicule electrice – proiectare și execuție"
Charging stations for electric vehicles – design and execution
The development of electric mobility directly depends on the existence of a modern and accessible charging infrastructure. In this context, ADREM has carried out a complex project for Enel X Romania for the design and execution of charging stations for electric vehicles, contributing to the expansion of the national electromobility network and accelerating the transition to low-emission transport.
alt="Stație de încărcare pentru vehicule electrice la reprezentanța BMW Auto Cobălcescu Pitești"
Charging station for electric vehicles at the BMW Auto Cobălcescu Pitesti dealership
The increase in the number of electric vehicles and the development of sustainable mobility require the expansion of the charging infrastructure in accessible and relevant locations for users. In this context, ADREM designed and implemented for Auto Cobălcescu the infrastructure necessary to power a fast charging station for electric vehicles at the BMW dealership in Pitesti.
alt="Audituri energetice pentru eficiență operațională și reducerea costurilor"
Energy audits for operational efficiency and cost reduction
ADREM has provided complex energy audit services for companies in various economic sectors, including industry, retail and office buildings, helping to identify opportunities to optimize energy consumption and develop effective strategies to reduce operational costs.
alt="Sistem Building Management System (BMS) pentru sediul central Volksbank România – București"
Building Management System (BMS) for Volksbank Romania – Bucharest headquarters
ADREM designed and implemented a complete Building Management System (BMS) solution for the headquarters of Volksbank Romania, located in the Nusco Center building in Bucharest.